Aromatics Plant 1 & 2

Get In Touch
Thompson's of Prudhoe working on a demolition

Aromatics Plant 1 & 2

VALUE: £24m+

CLIENT: Redacted for confidentiality purposes

PROJECT: AROMATICS PLANT 1 & 2

The site is located within the North Tees site, which occupies a large plot on the north bank of the River Tees. The works comprise of the hazardous insulating material removal, dismantling, demolition and site clearance of Aromatics Plants 1 and 2 comprising of various petrochemical process plant structures, associated utilities, switch rooms, pipework/cables/pipebridges, plant and equipment. The facilities comprise a variety of design standards dating back to the 1960’s with a combination of traditional concrete, brick, steel and timber constructions.

Thompsons of Prudhoe Ltd are contracted as the Principal Contractor by the Client to undertake the following scope of works;

  • Asbestos & Hazardous Materials Decontamination / Removal
  • Pre & Post Demolition CCTV Surveys
  • Recovery & Disposal of Residual Products in process plant & equipment
  • Demolition and Dismantling of Process Plant Structures
  • Dismantling & Removal of Associated Utilities
  • Dismantling & Removal of Switch Rooms
  • Protection of Existing Services, Drains, Roads,Footpaths & Ground Water Sampling Points
  • Processing of Demolition Arisings
  • Removal of Plant Structures
  • Removal of Pipework / Pipebridges
  • Removal of (above ground) Cables
  • Site clearance services